Our Proven Build Process

Phase 1

Permits to Plumbing

Phase 2

Gunfire & Decking

Phase 3

Tile & Equipment

Phase 4

Finish Out & Inspect

Permits to Plumbing


Let the demolition begin! Once the permit and HOA (if needed) is approved we will begin clearing the area for layout, forming and excavation. Following the excavation process our team will install steel reinforcing throughout the shell structures per city code and engineering detail.

Plumbing will be installed from the pool equipment location to the spa location with return lines for pool/spa circulation, dual port skimmer, designated vacuum line for pool cleaner with a three-way valve, autofill system (will maintain water level automatically) and finally a split main drain system with anti-vortex covers. This will be done in conjunction with installing a 1.5” gas line from the main meter to equipment locations and/or firepit & BBQ locations.

At this time, we will have the city / county inspect the progress and sign off on it so we can move on to phase 2.

1. Demo
2. Layout
3. Excavation
4. Steel
5. Plumbing
6. Gas
( Approximately Week 1 – 3 )

Gunfire & Decking


After we pass our first inspection we will “shoot” gunite, the structural shell of the pool / spa, install equipotential deck bonding and call for our second inspection.

1. Gunite
2. Deck Bonding
( Approximately week 4 – 5 )

Tile & Equipment


At this point you will really start to see your pool and spa come to life! Your choice of coping will be installed around the pool and spa. Next the tile will be installed on the waterline, any raised bond beams and spillways. Equipment will also be installed; we will have another inspection with the city at this point.

1. Coping
2. ( Tile Selections Here )
3. Equipment Installation
( Approximately week 5 – 6 )

Finish Out & Inspect


Let the demolition begin! Once the permit and HOA (if needed) is approved we will begin clearing the area for layout, forming and excavation. Following the excavation process our team will install steel reinforcing throughout the shell structures per city code and engineering detail.

Plumbing will be installed from the pool equipment location to the spa location with return lines for pool/spa circulation, dual port skimmer, designated vacuum line for pool cleaner with a three-way valve, autofill system (will maintain water level automatically) and finally a split main drain system with anti-vortex covers. This will be done in conjunction with installing a 1.5” gas line from the main meter to equipment locations and/or firepit & BBQ locations.

At this time, we will have the city / county inspect the progress and sign off on it so we can move on to phase 2.

1. Demo
2. Layout
3. Excavation
4. Steel
5. Plumbing
6. Gas
( Approximately Week 1 – 3 )

Pool Financing
Immediate & Online

Desert Luxury Pools is proud to partner with Custom Fin which provides am online lending platform for unsecured pool financing. This means when you submit a loan application within a matter of seconds multiple banks will provide you with an immediate online approval and you pick the loan configuration that best meets your families needs.

Photo Gallery

Testimonials

Providing nearly 30 years of Pool Experience to the Valley.

Jill
Hamilton

Maintenance & Service Customer

“Desert Luxury Pools always has gone above and beyond for us and we couldn’t be happier!”

Suzanne
Goldstein

Maintenance & Service Customer

We have been in our current home for three years and have been clients of Desert Luxury Pools from day one.

Dominique
Fruchtman

Remodel & Service Customer

“If you need anything for your pool, from maintenance to remodeling, then look no further then Desert Luxury Pools!”